SLEEPERS
TRACKWORK SYSTEMS
HOLDING THE TRACK TO ITS GEOMETRY
PRESTRESSED CONCRETE SLEEPERS
FROM STANDARD LENGTHS TO COMPLETE TRACKWORK LAYOUTS
Prestressed concrete sleepers provide the structural support, gauge control and load distribution required across railway track systems. CAL Group can manufacture sleepers from 3 to 13 metres in length for mainline, turnout and specialised track configurations.
CONTROLLED GEOMETRY
EACH SLEEPER HAS A DEFINED POSITION AND FUNCTION
LENGTH AND GEOMETRY
Sleeper length, section and geometry are developed around the loads, rail positions and space available within the track arrangement.
RAIL-SEAT POSITION
Rail seats are positioned to maintain the required gauge, alignment and route geometry across the complete layout.
FASTENING INTERFACES
Insert locations and rail-seat details are coordinated with the applicable fastening system and rail section.
LOADING REQUIREMENTS
Prestressing, reinforcement and concrete requirements are established around the applicable structural and service conditions.
IDENTIFICATION AND SEQUENCING
Turnout and specialised sleepers can be identified and sequenced to support their correct position within the final track layout.
CUSTOMER REQUIREMENTS
Sleepers can be manufactured against approved drawings, specifications and defined inspection requirements.
CONNECTED INTERFACES
DEVELOPED FOR THE FASTENING SYSTEM AROUND THEM
PRODUCTION ASSURANCE
CONTROLLED FROM INPUT MATERIALS TO FINISHED DIMENSIONS

MATERIAL CONTROL
Concrete inputs, reinforcement and prestressing materials are checked against the applicable requirements.

PRESTRESSING CONTROL
Prestressing operations are performed through defined production procedures and recorded parameters.

CONCRETE PERFORMANCE
Applicable concrete properties are verified against the specified acceptance requirements.

DIMENSIONAL INSPECTION
Sleeper length, section, rail-seat geometry, insert positions and other critical dimensions are checked before release.

TRACEABILITY
Production and inspection information remains linked to the identified sleeper or production batch.